Facilities

For an interactive map of City of Plano Facilities, click here.
View all facilities

Hoblitzelle Park

Take a video tour

Documents

Park Pond Restoration Map

Hoblitzelle East Park and Trail FAQs

Hoblitzelle East Park and Trail Renovation Map

Hoblitzelle Pond Restoration FAQ

Hoblitzelle East Playground Final Master Plan

Features

  1. Baby swings
  2. Hike and bike trails
  3. Pavilion
  4. Playground
  5. Restrooms
  6. Soccer Fields
  7. Sports Fields
Hoblitzelle Park is a community park with a picnic pavilion, three playgrounds (located in the north, south and east areas of the park) and restrooms. It runs along a scenic creek, and hard surface trail measuring 3.15 miles. For information on field reservations call 972-941-5413 or email fieldreservations@plano.gov.
Hoblitzelle Park Map

Hoblitzelle Park Trail Map

Pavilion Reservations
Please check availability here. Please call 972-941-7275 from 8am to 5pm, Monday through Friday to make a reservation. Reservations are accepted for one of two time slots - 8am to 2pm OR 3pm to 9pm. The reservation fee is $75 for residents ($150 for non-residents) per 6 hour time slot and is non-refundable rain or shine. A refundable reservation deposit of $75 will also be required. Both fees must be paid at the time of booking. *NOTE: restrooms will be winterized and closed mid-November through mid-March
Map of Hoblitzelle Park Pavilion

Hoblitzelle Pond Renovation
The Parks & Recreation Department has hired a contractor to remove silt, mud, and debris that has accumulated in the bottom of Hoblitzelle pond.  The sediment will be removed by hydraulic excavation equipment, dewatered in a dewatering bag, loaded onto dump trucks, and transported off site.  The park trail will remain open during the restoration.  Areas damaged by trucks and equipment will be restored.


Hoblitzelle East Trail and Playground Renovation Project

Hoblitzelle East Playground Final Master Plan

Thank you to all the residents who attended the community meetings and took the surveys for the renovation of the park and trail! Click on the image above to view the final master plan rendering.

April 4 Meeting Presentation
February 26 Meeting Presentation
January 24 Meeting Presentation